Gurgaon
Mumbai
Mumbai
Noida
Chennai
Bangalore
Ahmedabad
Mumbai
Long travel times in a 60-storey tower left cabins uncomfortably warm during peak summer, with no scope for water drainage in the shaft.
Elevakool high-rise units with dual water handling pumps and zero water discharge, plus ECAPS purification on the passenger cars.
Cabin temperature held at comfort levels through the summer with no drainage modification to the shaft.
A campus-wide requirement for reliable emergency communication across a mixed fleet of elevator brands.
Elecom master stations at the security desk with slim BX slave units retrofitted behind existing car operating panels, backed by Nano Power.
Emergency communication stays live for 60 minutes after a mains failure across every car.
Twelve high-footfall cars needed cooling and air quality control without extending shutdown windows.
Standalone ECAPS K Series car-top units installed alongside Elevakool E Series in phased night shifts.
Full fleet commissioned across two weeks with no daytime downtime.